• 16.09 : Matrix Illuminated! Beautiful! Bad spots identified and fixed.
  • 16.09 : Electronics Refactored.
  • 16.09 : Event announcement sent. Flyers made by Maja!
  • 16.09 : Camera mounted!
  • 16.09 : Video tested! Beautiful Image. (Thank you, RF Concepts )
  • 16.09 : Main room enclosure hangs.
  • 15.09 : Basic-X display program tested.
  • 15.09 : Serial indexing of bright LEDs fixed.
  • 15.09 : Sound Space Implemented
  • 14.09 : Floor Textile Partial Suspension Test Underway
  • 13.09 : Sky Hung under tension.
  • 12.09 : Consolidating basic-x display programs.
  • 12.09 : Serious floor hardware mounting by Lina and Gert.
  • 12.09 : Completed wiring of matrix.
  • 11.09 : Constellation wiki up.
  • 11.09 : Constellation Invitation Sent.
  • 11.09 : Event announcement up.
  • 11.09 : Solder matrix.
  • 11.09 : Attach floor mounting hardware.
  • 10.09 : Test frame stability. Consultation with Gert on Construction. Contract Gert to mount support hardware on walls.
  • 10.09 : Floor Bladders Arrived. Consulted with delivery person, Toure, who is studying communications. He would like to help us.
  • 09.09 : Reconsidering sound system spec due to budget.
  • 08.09 : LED Matrix Undergoing Physical Construction.
  • 08.09 : The Bright LEDs are now here!!
  • 08.09 : Open Constellation Design Initiative Begun.
  • 08.09 : LED control from BasicX successful!!
  • 08.09 : Tensile Floor Textile Construction Begun by Lina!!!
  • 08.09 : More Floor Textile+Water Prototyping.
  • 07.09 : More Spirited Discussion of the LED Mesh Structure!
  • 07.09 : Work with LED controller software.
  • 07.09 : Work on Fabric Floor
  • 07.09 : Development of candidate LED mesh structure design - summary at Project Syncoptic Technology
  • 07.09 : Consultations with Lina and Gert on LED mesh structure.
  • 06.09 : Established details (date, time, audience) regarding public exhibition at and with FoAM
  • 05.09 : Serial data transmission from Max to Basic-X successful!!!!!
  • 05.09 : Obtained most remaining electronics
  • 05.09 : LEDs Deliverable Monday
  • 05.09 : Liquid Floor Ordered. Deliverable Monday.
  • 05.09 : Rescale project to 6m x 6m, reducing floor cost by 40%.
  • 05.09 : Began Testing Serial Communication Capability of BasicX
  • 05.09 : LED Controllers arrived
  • 04.09 : unlocked (used hardware reset to remove interrupt loop)
  • 04.09 : Liquid Floor Component Tested.

(prior log available via long-term memory dump)